Powerful heating for large-scale users

Industriestrasse, Dietlikon
2016
Project Description

Replacement of the existing dual-boiler oil heating system with a new gas condensing boiler

The two properties were centrally heated by two oil boilers. These were dismantled, and a new 750kW gas condensing boiler was installed and connected to the gas supply. One of the properties was previously supplied with district heating without any communication or control. We have now connected the substation in the second property with a BUS system to heat the entire development more efficiently.

Project Description

Heating system upgrade from oil to gas

The goal was to intelligently connect the two properties to minimize energy consumption across the approximately 100m long district heating line. Additionally, given the age of the property and the size of the new boiler, a system separation was installed to protect the new gas condensing boiler from the existing building distribution network.

More Projects
from us

All Projects

Sustainable heat generation for a residential development

Supply a development with renewable heat

From Oil to Geothermal Energy

Implementing Renewable Energy

MS Helvetia

Installation of a new heating system on Lake Zurich

Heating a Church

Environmentally friendly new building with pellet heating

Plenty of Energy from the Air

Harnessing heat from the outside air is reaching new dimensions!

Natural heat from wood

Connecting a village section to a private heating network

Old becomes new

Bathroom Renovation

Cooling for the Office

Bivalent operation with gas and air/water heat pumps

Contact us
now

Do you have a project that requires expertise? We are ready to answer your questions and work with you to find the best solution for your needs. Don't hesitate to contact us today to learn more about our services.

Contact us now