Project Description

Which renewable solution works at around 500 kW?

The starting point was an existing gas heating system with annual energy consumption of around 1,000,000 kWh. In a feasibility study, we assessed different options for replacing the heat generation system. Air-to-water heat pumps were ruled out because of the required output of around 500 kW and the location in a residential area. Boreholes were not feasible due to the geological conditions, and a groundwater solution was not possible either. A pellet heating system emerged as the appropriate renewable solution.

Plant and room concept for the pellet heating system at Florastrasse in Uster
Project Description

480 kW of pellet heating in a listed building

The new plant consists of two ETA ePE-K 240 boilers with a total output of 480 kW and around 14,000 litres of buffer storage. Pellets are extracted using a so-called pellet mole, which moves across the surface of the pellet stock, draws pellets in from above and conveys them to the boilers through the suction line. We developed the plant and room concept, prepared the building permit application and managed the entire approval process, including coordination with the heritage authorities, through to completion. We also applied for and secured the available subsidies. The system has been operating reliably since January 2026.

Pellet mole extracting pellets from the storage room

More Projects
from us

All Projects
Air-to-water heat pump in a family home on Lägernstrasse in Dübendorf

Heating Replacement for a Family Home – A Simple Route to a Heat Pump

In a typical family-home neighbourhood in Dübendorf, we replace existing oil and gas heating systems with properly sized air-to-water heat pumps and coordinate the entire project.

Hydraulic schematic of the new heat pump system in Zollikon

Heating for the House and Pool, Cooling for the Building

New ground-source heat pump enables domestic hot water, pool heating and free cooling to operate simultaneously.

Eight Heat Pumps on One Shared Borehole Field

Four semi-detached apartment buildings are supplied by four decentralised plant rooms with a total of eight ground-source heat pumps. A shared field of 27 boreholes provides the heat source.

750 kW Hoval gas condensing boiler at Industriestrasse in Dietlikon

750 kW of Heating for Two Commercial Buildings

An ageing Viessmann twin oil-boiler system was replaced by a 750 kW Hoval gas condensing boiler. The new control system serves ten heating circuits across two buildings.

Two Buildings, Two Independent Ground-Source Systems

A feasibility study identified the economically suitable solution: the shared oil heating system serving two apartment buildings was replaced by two fully independent ground-source heat pump systems.

New heating system on MS Helvetia on Lake Zurich

A New Heating System for MS Helvetia

Zürichsee-Schifffahrtsgesellschaft commissioned us to replace the diesel heating system on MS Helvetia. At the same time, we solved the uneven heat distribution on board.

Pellet heating system for the church building in Schwerzenbach

Pellet Heating for a Church and Residential Building

For the new church building in Schwerzenbach, we worked with the specialist planner to install a pellet heating system combining different heat distribution systems and domestic hot water preparation.

75 kW air-to-water heat pump serving two apartment buildings in Gutenswil

75 kW from the Air for Two Apartment Buildings

Two large apartment buildings, an existing 75 kW oil boiler and no permission for geothermal boreholes. A large air-to-water heat pump provided an alternative route to renewable heating.

Central plant of the private district heating network in Freudwil

A Private District Heating Network for Freudwil

Two Fröling wood-chip boilers with outputs of 150 and 60 kW supply houses and apartment buildings in Freudwil through a private district heating network. We installed the central plant, substations and complete connections for the individual heat consumers.

Completed bathroom renovation at Frickenstrasse in Dübendorf

Bathroom Renovation from a Single Source

For this bathroom renovation in Dübendorf, we handled the complete planning, supply and coordination of the work involved – from product selection to the finished bathroom.

Cascade of two Alpha innoTec air-to-water heat pumps in Brüttisellen

Cooling with Heat Pumps, Saving Gas in Winter

For a commercial property in Brüttisellen, we supplemented the existing gas heating system with two Alpha innoTec air-to-water heat pumps. They provide around 40 kW of cooling in summer and reduce gas consumption in winter.

Contact us
now

Do you have a project that requires expertise? We are ready to answer your questions and work with you to find the best solution for your needs. Don't hesitate to contact us today to learn more about our services.

Contact us now