Heating for the House and Pool, Cooling for the Building

Forchstrasse, 8702 Zollikon
2026
Hydraulic schematic of the new heat pump system in Zollikon
Project Description

Three functions that did not work reliably together in the old system

The original heat pump had recurring problems with domestic hot water, pool heating and free cooling in the building. Domestic hot water was charged via an external plate heat exchanger, and its hydraulic integration was not properly designed. Pool heating used a changeover valve, while the pool heat exchangers were undersized. Simply replacing the heat pump would not have solved the underlying system issues.

Existing Viessmann heat pump system before replacement
Project Description

Two refrigerant circuits and a completely redesigned hydraulic system

We planned and implemented the new system entirely with our own team. The alpha innotec NP-BWV-43 ground-source heat pump has two separate refrigerant circuits. Domestic hot water is now produced with a coil cylinder charged by one of the two refrigerant circuits. Pool heating and free cooling in the building were also hydraulically redesigned. The system can now produce domestic hot water, heat the pool and cool the building at the same time – a major improvement over the previous Viessmann system.

New ground-source heat pump system for the house, pool and free cooling

More Projects
from us

All Projects
Air-to-water heat pump in a family home on Lägernstrasse in Dübendorf

Heating Replacement for a Family Home – A Simple Route to a Heat Pump

In a typical family-home neighbourhood in Dübendorf, we replace existing oil and gas heating systems with properly sized air-to-water heat pumps and coordinate the entire project.

Twin pellet boiler system with two ETA ePE-K 240 boilers in Uster

When a Heat Pump Is Not an Option: 480 kW from Pellets

For a listed property with annual gas consumption of around 1 million kWh, our feasibility study led to a 480 kW twin-boiler pellet heating system.

Eight Heat Pumps on One Shared Borehole Field

Four semi-detached apartment buildings are supplied by four decentralised plant rooms with a total of eight ground-source heat pumps. A shared field of 27 boreholes provides the heat source.

750 kW Hoval gas condensing boiler at Industriestrasse in Dietlikon

750 kW of Heating for Two Commercial Buildings

An ageing Viessmann twin oil-boiler system was replaced by a 750 kW Hoval gas condensing boiler. The new control system serves ten heating circuits across two buildings.

Two Buildings, Two Independent Ground-Source Systems

A feasibility study identified the economically suitable solution: the shared oil heating system serving two apartment buildings was replaced by two fully independent ground-source heat pump systems.

New heating system on MS Helvetia on Lake Zurich

A New Heating System for MS Helvetia

Zürichsee-Schifffahrtsgesellschaft commissioned us to replace the diesel heating system on MS Helvetia. At the same time, we solved the uneven heat distribution on board.

Pellet heating system for the church building in Schwerzenbach

Pellet Heating for a Church and Residential Building

For the new church building in Schwerzenbach, we worked with the specialist planner to install a pellet heating system combining different heat distribution systems and domestic hot water preparation.

75 kW air-to-water heat pump serving two apartment buildings in Gutenswil

75 kW from the Air for Two Apartment Buildings

Two large apartment buildings, an existing 75 kW oil boiler and no permission for geothermal boreholes. A large air-to-water heat pump provided an alternative route to renewable heating.

Central plant of the private district heating network in Freudwil

A Private District Heating Network for Freudwil

Two Fröling wood-chip boilers with outputs of 150 and 60 kW supply houses and apartment buildings in Freudwil through a private district heating network. We installed the central plant, substations and complete connections for the individual heat consumers.

Completed bathroom renovation at Frickenstrasse in Dübendorf

Bathroom Renovation from a Single Source

For this bathroom renovation in Dübendorf, we handled the complete planning, supply and coordination of the work involved – from product selection to the finished bathroom.

Cascade of two Alpha innoTec air-to-water heat pumps in Brüttisellen

Cooling with Heat Pumps, Saving Gas in Winter

For a commercial property in Brüttisellen, we supplemented the existing gas heating system with two Alpha innoTec air-to-water heat pumps. They provide around 40 kW of cooling in summer and reduce gas consumption in winter.